new slop aircraft fuel supply

Slop handling and oil/water separation plant

24 February 2025

Renovation of lighting in the Prep building and boiler house

24 February 2025

Steel Construction Recycling Plant

Market: Industry, Recycling

Design, calculation and detailing of the steel structure for a recycling facility.

Technology & Activities

Techniques:

  • 3D / CAD Drawing
  • 3D Animation
  • 3D Modeling
  • Utility
  • Construction
  • Mechanical engineering

Activities:

  • Design
  • Concept, Basic & Detail Engineering
  • Strong Calculate (EEM)
  • FEM calculations
  • Project management

Project description

Tebulo engineered a 40-by-50-meter, 9-meter-high steel structure for a recycling facility in the United States, including stairs, platforms, and fencing, for Bollegraaf Recycling Solutions. The steel structure was designed according to American standards and meets seismic requirements.

The calculation model was created in Advance Steel and calculated and analyzed using Robot Structural Analysis. The model was then further refined using Advance Steel. The result: a strength calculation report, a drawing package containing assemblies, weld assemblies, detailed drawings, parts lists, cutting drawings, NC files for drilling and sawing lines, material lists, nut and bolt lists, etc. A 3D model is also provided, which can be used for instruction during assembly work and for creating a 4D plan.