Replacing two 6 kV high-voltage installations

Market: Energy

Tebulo was responsible for replacing two outdated 6kV single-rail installations from 1966 and installing two choke coils.

Technology & Activities

Techniques:

Energy:
  • Low Voltage
  • Network simulation
  • Civil Engineering
Automation:
  • IED (Intelligent Electronic Device)
  • Control Systems

Activities:

  • Advice
  • Coordination of electrical work
  • Project guidance
  • Simulation of the high-voltage network

Project description

A paper mill in North Holland has successfully completed the renovation of part of its medium-voltage network. Tebulo Engineering was involved in the project management. The project was initiated to replace two 6kV high-voltage installations dating from 1966. Following the replacement of the high-voltage installations, two new choke stations were also installed and new high-voltage cables were laid. A 3D model of the new choke station was first created.

The conversion was completed in a period of 1.5 weeks, with 24-hour days. However, the preparation time took several months. Tebulo Engineering, in collaboration with the client, performed the FAT (Full Technical Assessment) for both high-voltage installations beforehand. Tebulo also provided consultancy services for the engineering.